| A TROJAN TASK Bridge sections are moved into place at Birkenhead. | ||
|---|---|---|
| This clip is not available for streaming at this time. Please contact WPA. | Tape Master: | 5376 |
| Catalog #: | 244639 | |
| Clip Number: | 244639-1 | |
| Orginal Film: | G 1455 | |
| Timecode: | 01:57:04 - 01:58:18 | |
| Location: | England | |
| Year Shot: | 1927 (Actual Year) | |
| Audio: | No | |
| Color: | No | |
| Headings: | CONSTRUCTION: Bridges ENGINEERING: Bridges, Misc LOCATIONS/EUROPE: UK, England | |
| Description: | A Trojan Task. 500 -ton bridge - after having dissected into 3 sections lifted and moved by world's biggest floating crane. Birkenhead C/U welder at work, followed by a panning shot across the steel sections. One huge section is moved slowly into position. L/S as men are seen holding guy ropes below. L/S of the silhouetted section hanging in the air. | |


