| FINE ENGINEERING FEAT A new ferry landing stage is completed in 24 hours. | ||
|---|---|---|
| This clip is not available for streaming at this time. Please contact WPA. | Tape Master: | 5311 |
| Catalog #: | 245118 | |
| Clip Number: | 245118-1 | |
| Orginal Film: | G 1187 | |
| Timecode: | 01:32:53 - 01:34:10 | |
| Location: | Seacombe, Cheshire | |
| Year Shot: | 1925 (Actual Year) | |
| Audio: | No | |
| Color: | No | |
| Headings: | CONSTRUCTION: Piers, Docks & Harbors ENGINEERING: Docks & Piers LOCATIONS/EUROPE: UK, England | |
| Description: | Same as catalog # 247842 Fine engineering feat. New 3000 ton ferry landing stage fixed - and in use - in 24 hours. Seacombe, Cheshire. L/S of the crane lifting up a long piece of metal, a ship sails along in the background and people watch in the foreground. Various shots as the metal is swung across and lowered into place. L/S from above of a boat next to the landing stage, the camera pans across it. | |


