| NEW TUBE HALFWAY MARK Work continues on the new Victoria Line underground tube network. Green Park. London. | ||
|---|---|---|
| This clip is not available for streaming at this time. Please contact WPA. | Tape Master: | 5956 |
| Catalog #: | 47568 | |
| Clip Number: | 47568-1 | |
| Orginal Film: | 65/61 | |
| Timecode: | 01:12:31 - 01:13:53 | |
| Location: | London, England | |
| Year Shot: | 1965 (Actual Year) | |
| Audio: | Yes | |
| Color: | No | |
| Headings: | CONSTRUCTION: Tunnels ENGINEERING: Tunnel, Rail LOCATIONS/EUROPE: UK, England, London | |
| Description: | NEW TUBE HALFWAY MARK Work continues on the new Victoria Line underground tube network. Green Park, London. M/S Green Park, pan to elevated shot of tunnel workings. M/S sign for Victoria Line. M/S machine at top of shaft. M/S looking down shaft. M/S section of tunnel where Green Park Station will be. M/S men looking at plan of tunnel, C/U arrow on plan of tunnel which points to position of drum digger. Good travelling shots along tunnel and lines. Various shots digger at face of tunnel. C/U and M/S clay being carried away on conveyor. Various shots as man looks through theodolite. C/U "1000 ft" marked on wall of tunnel, this is distance from Green Park. M/S wall segment pulled forward. M/S as it is unloaded. C/U workman watching. Various shots as segments are placed into position. M/S section of completed tunnel. | |


